Description
AN/PVS-14 Power Supply Service (Battery Pack)
This service for the AN/PVS-14 includes the diagnostics, cleaning, re-purge and a new battery pack or (PSU).
It is a common occurrence to see PVS14 monoculars hit the bench with a NO POWER condition from a bad power supply unit (PSU). Typically caused by a rupture or leaking of the battery. This causes corrosion in the battery compartment and ultimately causes complete failure of the Power Supply Unit (PSU).
- New mil-spec PSUs to replace the bad battery pack.
- Typically a 48-72 hour turn around time on this service.
- Detailed cleaning of optics, housing and intensifier.
- O-ring inspection and lubrication included.
- Nitrogen purge.
- UPS ground return shipping included.